Each year maintenance works are required to maintain Runway 1, the most used runway, and its adjoining taxiways. Runway 2 will be used as the sole runway between 22:00 and 06:00 hours on the following dates:
January 12th – 14th (22:30 – 06:00)
February 2nd – 4th (22:30 – 06:00)
March 9th – 11th (22:30 – 06:00)
April* 4th – 8th (22:30 – 06:00)
May 4th – 6th (22:30 – 06:00)
June 1st – 3rd (22:30 – 06:00)
July 6th – 8th (22:30 – 06:00)
August 3rd – 5th (22:30 – 06:00)
September 7th – 9th (22:30 – 06:00)
October* 3rd – 7th (22:30 – 06:00)
November 2nd – 4th (22:30 – 06:00)
December 7th – 9th (22:30 – 06:00)
January 2022 11th – 13th (22:30 – 06:00)
* 5-night closure
The dates above include ‘weather contingency’ and some redundancy; it is unlikely that all of the nights will be required. In the event of bad weather/low visibility or that no works are required; the works may be deferred or cancelled and Runway 1 reinstated. Normal operations will resume at all other times. These changes are permitted within the terms of the Planning Permission Runway 2.